cost analysis

The unit price of the total construction area shall be subject to the standard charging base of the project charging.

Unit: 10,000 yuan/m2

Land cost

land value

contract tax

total

2. Planning cost

market survey

Project planning cost

total

3. Survey and design fees

Land area survey fee

Planned construction area and single design fee

Construction drawing design fee construction area

Construction area landscape design fee

Intelligent design fee for building area

Model house decoration design fee

total

4. Pre-project cost

Area for general exploration expenses for cultural relics

Environmental assessment land area

temporary fence

Lin Jianshui

Linjiandian

Temporary road land

Land for garbage removal

Temporary housing

Land fixed-point measurement of land area

Pre-tender estimate preparation cost Jian 'an cost

Bidding cost Jian' an cost

Topographic map cost land area

Sunshine analysis

Pre-project reconstruction cost

total

Five-regulation examination fee

Government approval fee

Environmental protection construction permit fee

Municipal facilities supporting fee

Engineering transaction service fee

Construction sewage charges and noise charges

Labor insurance pooling fund

Quota determination preparation fee

Quality inspection fee

other charges

New wall material deposit and energy saving deposit

Construction supervision fee

Construction drawing examination fee

Audit fee settlement

Land requisition investigation fee land area

Land survey fee land area

Land registration fee

Fixed inspection line cost land area

Fire auxiliary building area

Natural gas design fee and construction area coordination fee

Land area for municipal pipe network design fee

Collision of municipal pipe network and project cost

Interval cost

Municipal cable trench occupation fee

Remote monitoring fee for power transformation and distribution

Real estate investigation

Waste heat power generation

Pile foundation detection

Settlement observation

Various test fees

Outdoor environment detection

Lightning protection and earthquake detection

total

Six Jian' an cost

Garden residence

high-rise apartment

Commercial platform

Underground garages and basements

total

Qigong construction supporting

kindergarten

Prop room

Jian 'an of Sales Office and Decoration of Model House

total

8. Infrastructure costs

sewer line

rain pipe

Outdoor water supply pipeline

Outdoor hot water pipe network

Outdoor steam pipe network

Outdoor water supply supporting fee

Natural gas pipeline

Outdoor low-voltage cable laying

Outdoor high voltage cable laying

Substation and distribution facilities

Water pump facilities

Heat exchange station

Landscape greening project

road engineering

Community intelligence

septic tank

hunting park

gate

Label system

Floodlight lighting

total

Late payment of the ninth installment

Real estate investigation

Real estate license processing fee

total

Ten unexpected expenses

Eleven financial expenses

Twelve management expenses

total investment