Job Recruitment Website - Property management - Wall construction contract

Wall construction contract

Model wall construction contract

In today's society, people pay more and more attention to contracts, and the legal effect of contracts is increasing day by day. The signing of the contract is the best specification of the rights and obligations of both parties. There are different types of contracts, and of course, they also have different purposes. The following is a sample of wall construction contract that I have compiled for you. Welcome everyone to learn from and refer to. I hope it helps you.

Wall Construction Contract 1 Party A:

Party B:

In accordance with the Contract Law of People's Republic of China (PRC) and its related laws and regulations, and following the principles of equality, voluntariness, honesty and credibility, the two parties reached the following agreement on matters related to the agreement on pasting exterior wall tiles through consultation:

I. Project name:

Second, the scope of contracting:

Exterior wall brick and roof tile pasting project

III. Form of contract:

The contractor does not contract materials.

Fourth, the construction period:

The construction period is _ _ _ _ days (the commencement date is subject to the date notified by Party A). Claim RMB for every day of delay in the construction period.

Verb (abbreviation for verb) settlement method:

According to the actual pasting area (the pasting area of each building is temporarily calculated as 3000m2), the external wall brick is 200x60mm, and the unit price is _ _ _ _ _ Yuan/㎡ (including facing, chamfering, jointing, cleaning, edge mending, vacancy filling, door and window detail treatment, etc.). Until it is accepted); Roof square brick 150x 150mm, unit price: RMB/㎡. Party B shall be responsible for the tools and meals used.

6. Quality and process requirements: Acceptance shall be conducted according to the current national and local acceptance specifications for construction projects, and they are qualified.

Exterior wall tiles:

1, before laying the wall tiles, select and arrange the bricks first to ensure the frame size and the position of the separation zone;

2. In the process of laying bricks, pull or play the control line, and control the flatness. Yin and Yang Angle, windows and balcony railings must stay the shop is stuck;

3. After bricklaying, the flatness of the wall should be controlled at about 3mm, the position of the separation zone should be accurate, the wall brick should be free from empty drum, and the brick joints should be dense, and there should be no empty joints. The external surface of wall brick should be clean and pollution-free, and the drainage of exposed components such as windowsill and bay window should be 1: 3 to find slopes, with the internal and external elevation difference of 20 mm, and the window cover should be divided into frames and the size standard should be unified.

4. After bricklaying, the bond strength shall meet the actual requirements and pass the drawing test. If it fails to pass the test, the expenses for retesting shall be borne by Party B. ..

5. During construction, the angle of Yin and Yang must be connected to ensure that the angle of Yin and Yang is square; The wall shall be leveled with 2m aluminum alloy ruler.

Roof tiles:

1, when laying roof bricks, first put a row of control bricks on both sides of the frame joint, find a good position and elevation, then pull the control line and paste the bedding face.

2. When laying bricks, you must draw fine lines, and each brick should follow the lines to make the stitches straight, and strictly control its slope and elevation, and pay attention to increasing the slope at the water outlet.

3. After the roof tile is laid, the surface of the floor tile should be cleaned and watered for maintenance for not less than 7d. During the curing period, people are not allowed to walk around, and other operations are not allowed to be interspersed on the surface, so as not to affect the quality.

Seven. Payment terms:

1. Complete 40% of the paste quantity of the building and pay 30,000 yuan; Pay 85% of the project payment (except for the lifting frame) after all pasting is completed; If the drawings pass the test and are accepted by the project department, the supervisor and Party A, 98% of the project cost will be paid, and 2% will be kept as the quality maintenance fund. All projects are completed and accepted, and paid in full after two years without quality defects.

2. Liability for breach of contract:

When signing the contract, the liquidated damages of 1 1,000 yuan shall be paid in advance. If the project cannot be constructed normally due to your reasons, you shall bear all the losses caused thereby. The default bond will be returned in one lump sum when all workers enter the site to ensure the normal construction on site.

Eight. Rights and obligations of both parties:

Party A's responsibilities:

1. During the construction, Party A shall provide the crane and outriggers (if the local outriggers are not in place, Party B shall be responsible for the scaffolding), and Party B shall be responsible for all other tools. ..

2. Party A only provides the material hoist, and Party B must designate a special person to be responsible for the operation, and the operator must have a work license.

Party B's responsibilities:

1. Party B must have labor service qualification and provide Party A with its company qualification. ..

2. After Party B's operators or staff enter the site, they must accept the three-level education and safety technical disclosure from the project department, and the operators must abide by ethical behaviors, and there must be no uncivilized behaviors such as stealing, robbing and beating; In the process of construction, Party B shall strictly abide by the rules and regulations of production safety, and must understand the safety precautions, and shall not arbitrarily destroy the on-site safety protection measures. In case of any safety accident, Party B shall take full responsibility, which has nothing to do with Party A.. ..

3. Party B shall not delay the construction progress without reason and must meet the requirements of Party A's construction progress. Party A has the right to lodge a claim for failing to meet Party A's schedule requirements.

4. Party B shall do a good job in protecting the products that have not been laid or are being laid; In the process of construction, it is necessary to ensure a good construction environment at the construction site, and the materials used are forbidden to be thrown around, and the materials provided by Party A shall not be wasted at will.

5. Party A directly supplies materials to the site, and Party B is responsible for loading and unloading to ensure the normal construction of the site. Party B has the responsibility and obligation to cooperate with Party A in the acceptance and storage of materials entering the site.

6. The second transshipment and storage of materials shall be solved by Party B itself. Party B must do a good job in the protection of finished products and mechanical equipment.

7. In the process of construction, arrange in strict accordance with the requirements of the project department and the construction specifications of each process. If the legitimate requirements of the management personnel cannot be accepted, Party A has the right to terminate the agreement, and Party B will leave by itself, and all the adverse consequences arising therefrom shall be borne by Party B. ..

8. Party B shall be equipped with a fixed substitute on site to be responsible for site management and coordination.

Nine, safe construction and civilized construction

1. In order to clarify the responsibilities of both parties, the safety goal is to ensure that no safety accidents occur. Party B shall do a good job in safety education and protection (including providing personal protective equipment for its personnel) in accordance with the regulations of relevant departments in Ruzhou.

2. When working high above the ground, you must wear safety helmet, safety belt and non-slip shoes. Can not meet the requirements, according to the 200 yuan fine.

3. It is forbidden to drink, fight or fight when entering the construction site. If found, it will be fined 1000 yuan/person.

4. Party B must ensure safe and civilized construction, and all safety accidents shall be borne by Party B. It is forbidden to use naked fire when entering the construction site, and the safety accidents caused thereby shall be borne by Party B. ..

5. Party B shall carry out civilized construction according to Party A's management requirements, keep the materials neatly stacked, remove the construction waste generated by Party B's construction in time, and keep the site clean after work. Materials stacked on the construction site shall not affect the construction of other processes. In case of cross operation of processes, the stacked materials must be cleaned and transported in time to ensure the normal construction of other processes, and Party B shall be responsible for the consequences arising therefrom.

X. Dispute settlement:

Disputes arising under this contract shall be settled by both parties through consultation or mediated by the administrative department. If negotiation or mediation fails, a lawsuit may be brought to the people's court where the project is located.

XI。 Other terms:

1. This contract shall come into effect as of the date of signature and seal by both parties. This contract is made in duplicate, one for each party.

2. The annexes to this contract and various written documents formed during the performance of this contract, after being signed and confirmed by both parties, become an integral part of this contract and have the same legal effect as this contract. For matters not covered in this contract, both parties can sign a supplementary agreement through consultation, which has the same legal effect as this contract.

Party A (seal):

Party B (seal):

Xx,xx,XX,XX

Wall Construction Contract 2 Party A: (hereinafter referred to as Party A)

Party B: (hereinafter referred to as Party B)

After consultation, Party B shall carry out waterproof maintenance for the leakage of the roof and the external wall of the roof in Modern Fort Community; In order to safeguard the rights and obligations of Party A and Party B, according to the relevant provisions of the Contract Law of People's Republic of China (PRC) and following the principles of openness, fairness and justice, Party A and Party B have reached the following agreement through consultation:

I. General rules:

Project location: three buildings (29- 13) and 3-29-8, 3-29- 13, 2-31-2, 2-31-kloc.

Second, the time limit for a project:

30 days, according to the requirements of Party A's notice to enter the site for construction, which will be postponed in case of rain.

Third, the contract method: (full contract)

1. Party B shall take full responsibility for the contractor's work, materials, package quality, package progress and package safety, and any safety accident has nothing to do with Party A, including tax stamps and other contracting methods.

2. Party B shall ensure that the company's roof waterproofing works reach excellent standards and carry out construction in strict accordance with the requirements of the new specifications and construction scheme. Waterproof works shall ensure no crust, dew, stratification and water leakage, and be evenly bonded with the base, and meet the requirements of house waterproof acceptance.

Four, maintenance quality standards and requirements

1. Party B has conducted field investigation on the site, and must find out the root causes of all leakage points according to Party A's requirements. Party B will choose a reasonable roof leak-proof maintenance method to determine the construction plan, and Party B will guarantee that there will be no water leakage after maintenance and leakage stoppage.

2. Party B shall pay attention to labor safety during the maintenance. In the event of a safety accident, all responsibilities and expenses shall be borne by Party B, and Party A shall not be held responsible.

3. The maintenance of the roof and the external wall of the roof must be carried out under the premise of not affecting the safety of the building, and the maintenance is mainly to solve the roof leakage and water seepage of the external wall of the roof. All the leaking parts involving the roof of the building (designated maintenance part) must be maintained. During the maintenance period, Party A can send people to supervise the quality and assist in some work on site.

4. Maintenance requirements:

(1) Party B shall organize maintenance personnel in detail, and be responsible for the safety and quality of the construction site, and Party B shall be responsible for all accidents caused thereby.

(2) Party B shall be responsible for cleaning up the silt and sundries caused by maintenance within the time limit specified by Party A, and obey the supervision and management of the maintenance project by Party A and the property management company, otherwise the losses and expenses caused thereby shall be borne by Party B.. ..

③ Maintenance period: normally, it must be completed within 30 days.

5. Maintenance and warranty matters: the warranty start date of the roof and the roof external wall maintenance parts is calculated from the date when the final maintenance inspection is completed. In the absence of force majeure and human factors, the minimum warranty period of roof and roof external wall waterproofing works is 3 years, that is, the warranty will continue for 3 years after the maintenance is qualified. In case of water leakage during the warranty period, Party B shall respond within 2 working days after Party A notifies Party B, otherwise Party B shall be responsible for the consequences.

Verb (abbreviation of verb) Rights and responsibilities of Party A:

1. Notify Party B of the entry time in advance.

2. Supervise Party B to complete the maintenance of roof and roof external wall leakage within the specified time limit according to the submitted construction plan and quotation.

3. Coordinate and cooperate with Party B in construction;

4. Party A has the right to supervise, inspect or spot check the engineering quality of Party B during the construction process, and put forward rectification suggestions to Party B when problems are found.

The responsibility of intransitive verb Party B:

1. After receiving Party A's notice, immediately put the waterproof material into the site, and provide the waterproof material certificate and test report, which can only be used after the on-site person in charge of Party A and Party A's representative have passed the inspection.

2. The construction shall be carried out according to the completion date proposed by Party A, and there shall be no artificial delay except inevitable factors.

3. We should abide by the rules and regulations of the property management company and not violate the regulations. If you enter the owner's indoor maintenance time, you must ask the property management company in advance, so that the property management company can inform the industry to cooperate with the construction in time. After the indoor maintenance is completed, it must be signed and approved by the owner. Without this evidence, Party A has the right not to pay the project payment.

4, should be strictly in accordance with the waterproof engineering standard specification construction, construction in strict accordance with the waterproof engineering construction scheme, if found, solve in time, to ensure the engineering quality to achieve excellent project.

5. Be responsible for providing handover procedures of acceptance data and submitting acceptance data.

6. Provide safety protection for construction personnel and be responsible for the safety of workers.

7. Other responsibilities caused by maintenance shall be borne by Party B..

Seven. Liability for breach of contract:

Losses caused by breach of contract by either party shall be borne by the breaching party.

Eight. This contract is made in sextuplicate, four for Party A and two for Party B, and shall come into force after being signed and sealed, with the same legal effect. Matters not covered in this contract shall be settled by both parties through consultation.

Party A (official seal): _ _ _ _ _ _

Party B (official seal): _ _ _ _ _ _

Xx,xx,XX,XX

Wall Construction Contract 3 Representative of Party A:

Representative of Party B:

In order to ensure the smooth progress of the project and the timely completion of the project with good quality and quantity, Party A contracts out the coating part of this project to Party B for construction. In order to clarify the responsibilities of both parties in the construction process, the following agreement is signed by both parties through consultation:

I. Project name: xxx.

Second, the project content: the internal and external wall coatings and roof waterproofing of this project.

Three. Quality requirements: Construction shall be carried out in accordance with the drawings, current relevant specifications and process requirements, and qualified.

Four. Process and material requirements: the exterior wall is made of environmentally friendly putty, and the angle of yin and yang is straight, and the qualified exterior wall cement paint is evenly painted on one bottom and two sides.

Verb (abbreviation for verb) settlement method:

1. External wall cement paint (calculated according to the actual development area): RMB per square meter.

2. Interior wall latex paint (subject to the actual developed area): per square meter.

3. The interior wall is plastered twice, and the bottom of the ceiling formwork (according to the actual paving area): RMB per square meter.

4. Fill the bottom of the interior wall ceiling formwork with ash twice (calculated according to the actual developed area): RMB per square meter.

5. SBS coiled material for roof waterproofing is RMB per square meter, and 98 1 composite cement base is RMB per square meter.

Payment method of intransitive verbs:

Workers pay 20,000 yuan for preparation when they enter the site, 30% of the total project price after scraping putty, 65% of the total project price after painting, and the remaining 5% within one month after the project completion acceptance.

Seven. Other matters:

1. Party B shall be responsible for the kitchen, coal, firewood and temporary lighting required by workers' life, such as accommodation and cooking room.

2. All tools used in the construction shall be provided by Party B. ..

3. Personnel entering Party B's construction site shall be educated by the team leader, and a responsibility letter for production safety shall be signed with Party A, and they shall abide by the relevant system of the construction site. In case of any safety or quality accident during the construction, and the safety of others is caused by Party B's responsibility, Party B shall be responsible for compensation.

Eight. This contract is made in duplicate, one for each party. Matters not covered shall be settled by both parties through negotiation, and this agreement will automatically become invalid after the project payment is paid.

Party A (official seal): _ _ _ _ _ _

Party B (official seal): _ _ _ _ _ _

Xx,xx,XX,XX

;