Requirements and steps for installing charging piles are as follows:

1. has its own parking space or an approved parking space with a lease term exceeding 1 year.

2. Obtain the consent of the property.

3. Apply for installation on the APP of the power grid company.

4. Prepare the charging pile equipment and wait for the door-to-door installation.

Charging pile:

Charging pile refers to a charging device that provides energy supplement for electric vehicles. Its function is similar to that of a tanker in a gas station. Can be fixed on the ground or wall and installed in public buildings (public buildings, shopping malls, public parking lots, etc.). ) and residential parking lots or charging stations, and can charge all kinds of electric vehicles according to different voltage levels.

The input end of the charging pile is directly connected to the AC power grid, and the output end is equipped with a charging plug to charge the electric vehicle. Charging piles generally provide two charging methods: conventional charging and fast charging. People can use a specific charging card to swipe their cards on the man-machine interface provided by the charging pile, and print the corresponding charging operation and cost data. The charging pile display screen can display data such as charging amount, cost and charging time.

By the end of June 2023, more than 6.6 million charging piles of various types had been built nationwide. Charging pile (bolt) can be used as a terminal for citizens to purchase electricity, and it can realize time, electricity and money charging. At the same time, in order to improve the efficiency and practicability of public charging piles (plugs), a pile (plug) will be added one after another to charge electric bicycles.

According to the installation location, it can be divided into public charging piles and special charging piles. Public * * * charging piles are built in public * * * parking lots (garages) combined with parking berths to provide public * * * charging services for social vehicles. The special charging pile is the parking lot (garage) owned by the construction unit (enterprise) for the use of the internal personnel of the unit (enterprise).

Self-use charging pile is a charging pile built in personal parking space (garage) to provide charging for private users. Charging piles are generally used in combination with parking spaces in parking lots (garages). The protection level of charging piles installed outdoors should not be lower than IP54. The protection level of charging piles installed indoors should not be lower than IP32.