Job Recruitment Website - Property management company - Is the floor drain blockage outside the air conditioner under the jurisdiction of the property?

Is the floor drain blockage outside the air conditioner under the jurisdiction of the property?

Legal analysis: solving the dispute of house water leakage;

1. First of all, we must find out who this management responsibility belongs to. Public facilities shall be paid from the maintenance fund by the property; Non-public facilities depend on whether they are exclusive or * * *. If there is an agreement between the parties, such agreement shall prevail. If there is no agreement, the owner of the proprietary part shall be responsible for the management and maintenance. However, there is controversy about who is responsible for the management and maintenance of some parts of * * *. If the waterproof layer has facilities as * * *, as it belongs to concealed works, it is generally believed that the upstairs residents, as the actual users, should bear the behavior obligation of reasonable use, and the downstairs residents, as the beneficiaries, also have corresponding obligations, mainly reflected in the cost commitment.

2. Developer's responsibility: During the warranty period, the developer shall take full responsibility for water leakage caused by non-human reasons.

Legal basis: quality warranty measures for housing construction projects

Seventh in normal use, the minimum warranty period of housing construction projects is:

1. Foundation and main structure engineering, and the reasonable service life of the engineering specified in the design documents;

Secondary roof waterproofing works, bathrooms, rooms and external walls with waterproof requirements, 5 years;

(3) The heating and cooling system consists of two heating periods and cooling periods;

Four electrical systems, water supply and drainage pipelines, equipment installation for 2 years;

5. The renovation project lasts for 2 years.

The warranty period of other projects shall be agreed by the construction unit and the construction unit.

Eighth housing construction project warranty period from the date of completion and acceptance of the project.