Party A (Employer):

Party B (contractor):

According to People's

5 written contract template for water pipe maintenance

Template of written contract for water pipe maintenance 1

Party A (Employer):

Party B (contractor):

According to People's

5 written contract template for water pipe maintenance

Template of written contract for water pipe maintenance 1

Party A (Employer):

Party B (contractor):

According to People's Republic of China (PRC) Contract Law, People's Republic of China (PRC) Construction Law, People's Republic of China (PRC) Fire Protection Law and other relevant laws and regulations, combined with the specific conditions of this project, Party A and Party B reached an agreement through consultation on the basis of voluntariness, equality, fairness, honesty and credit.

Article 1 General situation of the project

I. Project name:.

Two. Project location:.

Three. Building area:.

Article 2 Scope of Work

Scope of works contracted by Party B:.

Article 3 Method of Contract

Contract method (please tick the box):

□ Engineering and material contracting

□ Others:.

Article 4 Term of Contract

1. The term of this contract is days, counting from the date when Party B enters the site.

Party B shall enter the site within days after receiving Party A's written notice of entry.

Second, in the process of construction, in case of the following circumstances, the construction period shall be postponed accordingly:

(1) The normal construction period is affected by Party A's design change or increase in engineering quantity;

(2) Party A fails to provide construction drawings, materials and equipment on schedule; The materials and equipment supplied do not meet the construction needs; When it is found that the supplied materials and equipment are defective and need to be repaired, matched, replaced or replaced, which affects the progress;

(3) Party A fails to provide the construction site, water and electricity, and the roads on site are blocked and obstacles are not removed, which affects the on-site construction;

(four) in the construction, such as continuous interruption of water supply and power failure, which affects the normal construction;

(5) The last procedure is not completed due to reasons other than Party B, which affects the project progress;

(6) Before the concealed works are concealed, Party B notifies Party A for acceptance, but Party A fails to accept them;

Article 5 Project Price

Both parties choose the following methods to determine the project price of this contract, and attach a budget table, excluding the fire acceptance fee:

Formation of contract price: according to the Table of Consumption Quota and Unit Price of Installation Project in Hubei Province in 2008, the Table of Consumption Quota and Unified Base Price of Municipal Project in Hubei Province and the corresponding cost quota, combined with the design drawings, the budget expenses are formed, and the project price is formed after Party A's approval ... If there are additional projects, the settlement method shall be implemented according to the above-mentioned equivalent standards.

First, the tentative price. The project price is tentative, and both parties will determine the final project price at the time of settlement.

(1) The project price is tentatively set as (in words) and (in figures).

(2) Calculation method of project price adjustment:

(3) Settlement basis: The items within the limit are based on the relevant quotas issued by the relevant state departments; The cost of materials and equipment beyond the scope specified in the quota shall be subject to the supplier's invoice or relevant basis; The engineering quantity shall be subject to the visa of Party A's on-site engineer.

Second, fixed prices. The project price is determined according to the drawings and the comprehensive unit price, and the project price will be adjusted only under the following item (2).

(1) The project price is (in words) and (in figures).

(2) During the performance of the contract, the project price of this project shall be adjusted under any of the following circumstances:

(1) Both parties reached the following agreement on the market price change of Party B's contracted materials or the price adjustment of the project price management department:

(2) Approved design changes;

(3) Party A changes the approved construction organization design (except for mistakes), resulting in increased expenses;

(4) Other factors agreed by both parties:

(3) Calculation method of project price adjustment:

Article 6 Payment of Project Price

1. Project advance payment: Party A shall pay% of the project price in advance within the day after the signing of this contract.

2. Project progress payment: The project progress payment shall be paid in proportion determined by both parties according to the project price and the actually completed engineering quantity. The settlement and payment of the project progress payment and the calculation of quantities are agreed as follows:

3. Party A shall pay% of the project price within days after the project is accepted by the fire department of the public security organ or put on fire record.

4. If settlement is required, Party A shall pay% of the settled project price within days after both parties confirm the completion settlement report.

5. The quality security deposit for this project is% of the settled project price, which shall be paid to Party B within the day after the quality guarantee expires.

Article 7 project settlement

1. Within days after the project passes the acceptance or filing by the fire department of the public security organ, Party B shall submit the project completion settlement report and complete settlement materials to Party A, and both parties shall settle the project.

2. After receiving the completion settlement and complete settlement data submitted by Party B, Party A shall confirm it within days or propose amendments.

Article 8 Project quality

1. Party A shall provide Party B with construction drawings and construction instructions two days before Party B enters the site, and make technical disclosure to Party B..

Party B shall issue the general construction progress plan to Party A, and Party A may propose amendments.

2. Party B shall organize the construction according to the engineering drawings, construction instructions, organization plans and progress plans. If there is any change in the above agreed matters, both parties shall notify each other in writing.

Three. Where concealed works are involved, Party B shall notify Party A to be present for acceptance before concealment. If Party A does not accept the project, Party B may stop the construction of the concealed project; If the acceptance is unqualified, Party B shall make rectification and re-accept.

Four. Party B guarantees that this project meets the national technical standards for fire control in engineering construction.

Five, the fire products used in this project must comply with the provisions of the state. The use of fire protection products that are subject to compulsory product certification according to law must be certified by a certification body with legal qualifications in accordance with the mandatory requirements of national standards and industry standards.

Article 9 Commissioning and acceptance

1. After the completion of the project, Party B shall notify Party A in writing for acceptance, and Party A shall organize acceptance by itself within days after receiving the acceptance notice.

Two, after the acceptance of their own, the two sides to handle the project handover procedures.

Employer (hereinafter referred to as Party A):

Contractor (hereinafter referred to as Party B):

According to the Contract Law of People's Republic of China (PRC), Regulations on Construction and Installation Contract, Regulations on Construction Project Contract and other relevant laws and regulations, and following the principles of equality, voluntariness, fairness and good faith, the following agreement is reached on labor services in the construction of this project through consultation between both parties:

Article 1: Project Overview

I. Project name:

Second, the project site selection:

Third, the project content:

Article 2: Scope of Contract

I. Within the scope

All buildings: (See attached drawings for the scope of demolition)

Two, the demolition of the housing listed in the appeal floor, the demolition to the outdoor floor is plus or minus 0.

Article 3: Construction Period

1. Date of entry: YY, date of completion: YY, date of completion.

2. The total construction period is months. According to Party A's relocation, one room will be vacated and one room will be demolished. In order to make the demolition project go smoothly, Party A shall deliver% of the total demolition amount to Party B within one month after the signing of the contract,% of the total demolition amount to Party B within two months, and the remaining demolition amount shall be delivered to Party B before.

Article 4: Contract Price, Payment and Settlement of Project Funds

I. Pay RMB/㎡ to Party A. ..

2. From the date of signing this contract, Party B shall pay Party A the first demolition payment of RMB10,000.00 Yuan.

3. When the project progress reaches%, the remaining buildings to be demolished shall be delivered to Party B before.

Article 5: Responsibilities of both parties

I. Party A's responsibilities:

1, responsible for water, electricity, gas, communication, etc. of the demolished houses.

2. Cooperate with Party B to coordinate all aspects.

3. Ensure the integrity of the buildings and structures to be demolished.

4, responsible for the supervision and inspection of the demolition of the construction site.

5. Responsible for the acceptance of demolition plots.

Two. Party B's responsibilities:

1. Enter the demolition site on time as required by Party A to ensure the smooth completion of the construction period.

2. Be responsible for the demolition, removal and cleaning of all buildings and accessories listed in this agreement.

3. All responsibilities and expenses such as accidents and administrative penalties caused by Party B shall be borne by Party B itself.

4. Prepare the demolition environmental protection scheme and safety construction scheme, adhere to civilized construction at the demolition site, arrange personnel to clean up the roads in and out of the construction site in time, and pile up recycled materials in strict areas. It is forbidden to pile up any materials on roads and passages.

Article 6: Liability for breach of contract

1. If Party A delivers the construction site within the time stipulated in the contract, and Party B fails to complete the demolition task within the time stipulated in the contract, it will be fined 5,000 yuan/day for each day of delay.

Article 7: Safe construction

1. Party B shall take strict safety protection measures in accordance with relevant regulations, and bear the responsibility for accidents caused by its own ineffective safety measures and the expenses arising therefrom.

Second, machinery and personnel should be insured before entering the site. The insurance premium is considered in the quotation, and Party A will not pay it separately. Party B shall abide by all rules and regulations of the construction site, and be responsible for all safety accidents caused by Party B. The latest model of house demolition contract.

Three. In case of major accidents, Party B shall immediately report to relevant departments and notify Party A's representative according to relevant regulations. At the same time, according to the relevant requirements of the government.

4. Before Party B starts construction in power equipment, high-voltage lines, underground passages, inflammable and explosive areas and near main streets, Party A shall arrange professionals to cooperate.

Article 8: Disputes

Any dispute between Party A and Party B shall be settled through consultation for the purpose of friendly cooperation.

This contract is made in quadruplicate, each party holds two copies, and the signature and seal have the same legal effect.

Date of conclusion of this contract: year month day.

Employer: Contractor:

Address: Address:

Legal representative:

Authorized Agent: Authorized Agent:

Tel: Tel:

Template of written contract for water pipe maintenance 2

Party A: (hereinafter referred to as Party A)

Party B: (hereinafter referred to as Party B)

In order to improve the heating quality of the Division and ensure the normal operation of equipment and pipe network during the heating period, Party A and Party B have reached the following terms on the maintenance of heating boilers through consultation:

1. Party A entrusts Party B to maintain all heating boilers (four sets), equipment and pipe networks (heating area10875m2) in Zhongqi office building, Bayin Hang Gai heating area, Daerqi heating area and Cultural Station heating area. The specific work mainly includes the maintenance and replacement of boilers and pipelines. During the heating period, the pipe network should be inspected and maintained irregularly to ensure the normal operation of the heating work. Party B's self-provided personnel, self-provided maintenance tools, self-provided maintenance accessories and materials undertake the above maintenance tasks.

2. The validity period of the contract: from the date of 20 to the date of 20.

Three. Settlement price and payment method: Party A and Party B agree through negotiation that the annual service fee is RMB two hundred thousand Yuan only (¥ 200,000), and Party B will settle the annual maintenance fee in two installments with invoices at the end of the first quarter and the end of the fourth quarter.

Four. This contract is made in duplicate, one for each party. Party A and Party B shall consciously abide by the relevant provisions of this contract. Matters not covered in this contract shall be settled by both parties through consultation.

Party A:

Party B:

Date:

Template of written contract for water pipe maintenance 3

Party A:

Party B:

Based on the principle of mutual benefit, Party A and Party B have entered into the following information product maintenance contract through friendly negotiation.

1. The information products included in this contract are as follows:

Product name:

Maintenance items:

Amount: (RMB)

Remarks:

Two. Party B shall provide Party A with free information product maintenance services, and the corresponding service terms are as follows:

1. During the validity period of the contract, Party B will only repair the products listed in this contract. If it is necessary to replace parts, Party A will bear the cost of parts.

2. If Party B thinks that the product needs to be taken back for maintenance, Party B's technicians will go directly to Party A to get the machine.

3. During the validity of the contract, Party B will clean the products listed in this contract twice for free.

4. This contract does not involve related software or network support services, and all maintenance services involving software or network support issues are charged according to Party B's charging service standard.

5. The place where Party B carries out maintenance is the place where the information products included in this contract are now used by Party A (the date of signing the contract).

6. Party A shall be responsible for the security of its proprietary confidential information.

Three. Validity and duration of the contract: This contract shall come into effect after being signed and sealed by both parties. The contract term is within one week from the effective date of this contract.

4. This contract is made in duplicate, one for each party, with the same effect. Party B has the right to interpret this contract.

Matters not covered shall be settled by both parties through consultation.

Party A (official seal): _ _ _ _ _ _

Party B (official seal): _ _ _ _ _ _

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

Template of written contract for water pipe maintenance 4

Party A:

Party B:

Through negotiation between Party A and Party B, Party A has contracted out the pipeline maintenance project to Party B for construction, and reached the following agreement, which is expected to be abided by both parties.

1. Project name: Runze Garden Drainage Pipeline Maintenance;

2. Project location: Runze Garden of the company;

Three. Scope of contract: replacement, joint repair, painting and garbage removal of drainage pipes;

Four. Contract method and unit price: contracting for labor and materials. The above project content is *** 18700 yuan;

5. Commencement date: from the date of 20 to the date of 20;

Quality standard of intransitive verbs: Party B must maintain according to Party A's requirements, and the quality must meet the requirements;

Seven. Payment method: Party B shall pay in one lump sum according to the final settlement amount after completion. The final accounts are compiled according to the relevant quota of 20 1 1 in Shanxi Province;

Eight. Safety: Party B must abide by Party A's safety management rules and regulations during the maintenance period to ensure the safe and smooth completion of the project.

Nine. This agreement is made in quadruplicate, with Party A and Party B holding two copies respectively, which shall come into effect after being signed by both parties and become invalid after payment is completed.

X. Matters not covered in this Agreement shall be supplemented by both parties through consultation.

Party A (seal):

Party B:

Date:

Template of written contract for water pipe maintenance 5

Party A: (hereinafter referred to as Party A)

Party B: (hereinafter referred to as Party B)

Because the toilet in the office building is in disrepair for a long time, the sewer is blocked and the sewage is cross-flowing, which has caused inconvenience to office and life. In order to create a good office and living environment, Party A and Party B have reached the following agreement on the replacement and maintenance of this sewer project:

I. Project Location:

Second, the project content:

Sewer installation and renovation.

Third, the project quality:

1, PVC pipes must be national standard products.

2. Pipeline construction and installation meet the technical requirements of national installation, so that the bottom plate is flat and firm, and the drainage is smooth.

Four. Construction time: 20 years165438+1October 29th to 20 years, 65438+February.

5. Project cost: The total project cost is RMB (whole), including labor cost and material cost.

6. Payment method: After the project is completed, the payment shall be made by acceptance bill, with the amount of RMB Yuan only, and paid in one lump sum.

Seven. Other agreed matters.

1. The warranty period is 1 year. Party B shall be responsible for the maintenance of water seepage, water leakage, rain or strong wind damage caused by quality problems, and the expenses shall be borne by Party B. ..

2. Party B shall abide by the management regulations on safety production in engineering construction and organize construction in strict accordance with safety standards. Party B shall be solely responsible for all consequences caused by construction safety.

Eight. This contract is made in duplicate, one for each party, and shall come into effect after being signed by both parties.

Party A (official seal): _ _ _ _ _ _

Party B (official seal): _ _ _ _ _ _

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

Five related articles on the template of written contract for water pipe maintenance:

★ Five official samples of water pipe maintenance contract.

★ Model water pipe maintenance contract

★ Pipeline maintenance contract template

★ Sample of water pipe maintenance contract

★ Sample of water pipe maintenance contract

★ Model Contract for Pipeline Maintenance and Construction

★ Model sewage pipeline maintenance contract

★ 5 Simple sewer contract

★ Sample of sewage pipeline maintenance contract

★ Model fire pipeline maintenance contract