Matters needing attention in wall demolition and reconstruction of Beijing Jingling Decoration Beijing Ouchuangshi Chuangshi Decoration House

1. Note that only non-bearing walls can be demolished. Be sure to find out which walls can be demolished and which can't be demolished before renovation, otherwise the consequences will be unimaginable.

Only non-bearing walls can be demolished. Non-bearing walls are generally thin, about 10 cm thick. Usually, these walls are marked on the floor plan.

2. Pay attention to the transformation of the circuit pipeline. Before disassembly, the transformation direction of the circuit should also be considered in detail.

Generally, there are circuit pipelines in the wall, so be careful not to open the circuit because of rough construction.

After all, the transformation of the circuit is a very water part of the project cost. If you don't want the decoration company to make you too much money, you must make a good plan.

3, the new wall according to the situation. High-rise buildings generally adopt frame structure, that is, the outer wall is load-bearing, and the inner wall is generally light structural wall. The inner wall only acts as a partition and has little effect on bearing.

When building new walls, people usually use the same light wall as the original cement board wall or gypsum board, or choose materials with better sound insulation effect or high cost performance according to their own requirements.

4. Find a professional and experienced decoration company. Many people don't know what the structure of their house is. If the wall is demolished, you must look for an experienced decoration company to understand the wall structure before making a decision, so as to avoid the danger caused by random wall demolition.

At the same time, before construction, it must be reported to the property management department for the record, and construction can only be started after approval.