Stage 1: preparation before transformation
1) Understand the decoration: Understand your own preferences and life demands, determine the decoration style and functional requirements, understand your own bottom line of decoration funds, and reserve about 20% of emergency expenses and 80% of the decoration budget.
2) Choose a company: choose a suitable and reliable decoration company according to your own decoration demands.
3) Determine the plan: After determining the company, the designer will look at and measure the house, give the plan according to your favorite style, functional requirements and budget, and confirm it.
4) Signing the contract: read the budget quotation issued by the company clearly, which generally covers the cost of materials, labor, design and management, and sign the renovation contract after confirmation.
5) Handling formalities: before entering the site, you need to go through the property examination and approval, go through the construction formalities, and pay the deposit to the property before entering the site for decoration.
6) Commencement disclosure: Before commencement, the designer, supervisor and owner shall hand over, confirm, demonstrate and supplement the construction plan and drawings on site.
The second stage: foundation construction
7) Main body transformation: mainly for wall demolition, wall building, wall covering, window replacement, etc. Pay attention to measuring the layout size of the furniture, determine the building area of the wall and the ground, and remove the wall to avoid the bearing wall.
8) Hydropower transformation: determine the accurate positions of indoor socket switches and various electrical appliances, arrange as many sockets as possible, make water and electricity lines horizontal and vertical, and separate hot and cold water pipes.
9) Waterproofing: kitchens, bathrooms, balconies and other places that need water need waterproofing. After waterproofing is completed, a closed water test shall be conducted.
10) Woodworking: gypsum board ceiling installation for floor heating, central air conditioning installation, and gypsum board modeling for TV background wall.
1 1) Tiling: Before tiling, the brick should be soaked, with seams left, and paved neatly; Measure the size of cabinets and custom furniture after tiling.
12) kitchen and bathroom suspended ceiling: other suspended ceilings for kitchen and bathroom aluminum gusset plates, electric water heaters, cabinets and kitchen appliances after the suspended ceiling is completed.
13) wall surface: the basic treatment of wall surface needs to be done three times. After the second pass, doors and furniture can be installed. After three times, the wall began to brush latex paint.
Stage III: Installation Project
14) installation: floor installation switch socket installation lamps and hardware sanitary ware installation.
15) Beautiful joint of ceramic tile: The purpose of beautiful joint of ceramic tile is to avoid dust accumulation in the later period.
16) curtain installation: curtain installation is the last step of home improvement, and the decoration is basically completed at this time.
The fourth stage: completion acceptance
17) ground acceptance: appearance, flatness, slope and hollowing inspection.
18) wall acceptance: appearance, vertical flatness and hollowing inspection.
19) Waterway acceptance: quality firmness and flexibility inspection, water supply and drainage inspection.
20) Circuit acceptance: electrical box inspection, electrical appliances and switch sockets use inspection.
2 1) Woodworking acceptance: check the appearance, structural stability and joint embedment.
22) Acceptance of doors and windows: Check the appearance of doors and windows, sealing strips, borders and locks.
The fifth stage: check-in stage
23) Land reclamation and cleaning: Generally, after the hard installation is completed, the space should be kept as empty as possible before the furniture and household appliances enter the site, and the initial cleaning after decoration should be thorough.
24) Furniture and household appliances enter the site: buy furniture and household appliances after the completion of water and electricity. At this time, the location and placement size of the water and electricity sockets have come out. Pay attention to protect the ground before processing to prevent scratches.
25) Soft decoration: Home appliances and furniture can be decorated with soft decoration that the owner likes after entering the site.
26) Move in: The last step is to move in. Pay attention to the protection of finished products when moving to avoid friction with walls, floors, doors, etc. And plan the order of large furniture in advance.
The above is about the steps and detailed process of house decoration. I hope I can help you. A reliable decoration company can help you control the whole decoration process, reduce the cost of rework and make the house decoration faster and better. Chengdu Yi Shu Mansion is renovated, providing free decoration design and quotation service, comparing many companies and choosing the most satisfactory company.
- Previous article:Middle-class lesson plans
- Next article:How about Paulie opening Country Garden for the first time? OK or not? Is it worth buying?
- Related articles
- Evergrande does not provide invoices for property fees.
- What about Shantou Xingda Gong * * Transportation Co., Ltd.?
- Peripheral facilities of Oriental Building
- What is the price of Xinyi 20 10? Please tell me from a knowledgeable friend. Thank you.
- Which subway should I take to go to Bai Rong World Trade Center?
- How do accountants of property management companies keep accounts?
- Can the basement charge the property fee at the normal price?
- Deputy Director of Xinxiang Tourism Bureau, Xinxiang Tourism Committee
- How about Creative Port International E-commerce Industrial Park Co., Ltd.?
- Investment proportion of installing elevators in Lanzhou