Job Recruitment Website - Recruitment portal - What procedures are needed to open a water plant?

What procedures are needed to open a water plant?

Hello!

1. Process of opening a water plant

1. The prerequisite is to have a plan for what you want to do.

2. Have sufficient funds.

3. Drill deep wells.

4. Machines that feed production water, inkjet printers.

5. Buy a car that delivers water.

6. Recruiting personnel.

2. To operate a water plant, you must obtain the following "licenses"

1. "Production License" and "QS Certification" from the Quality and Technical Supervision Bureau.

2. "Health License" Food and Drug Administration.

3. "Employee Health Certificate" Health Bureau.

Only after the above pre-approval is completed, you can apply for the following documents:

1. "Business License" from the Industrial and Commercial Bureau.

2. "Tax Registration Certificate" tax bureau.

3. There are three forms of registration

1. Enterprise "production limited liability company".

2. "Self-employed" (less than 7 people).

3. "Informal employment labor organization" (three unemployed people).

If you are an unemployed and laid-off person in the city, it is most suitable to apply in the form of "informal employment labor organization", and you can enjoy the government's preferential policy of encouraging entrepreneurship to be exempted from tax for three years.

IV. Factory building requirements

Evaluation reports of natural mineral water, pure water, etc. approved by drinking water experts of the competent department and authenticated by the geological and mineral department will be used as the basis for feasibility assessment , must not blindly sign and blindly build factories.

1. Never build a factory far away from a water source (well, spring). The best solution is to keep the factory building and the water source as close as possible.

2. The size of the factory should depend on the mineable reserves of mineral water and purified water, resource sources, purified water plant equipment, mineral water plant equipment production capacity and financial guarantee, etc.

5. Factory decoration requirements

The scale of the factory is based on the factory construction requirements, but it must be as spacious and comfortable as possible while accommodating filling and other equipment. Generally, medium-sized enterprises are 20-50 meters long and 10-15 meters wide. Within this range, different purposes are divided into bottle washing, filling, water treatment, etc. The requirements in the workshop must be clean and dust-free with terrazzo floors, smooth drainage, and no accumulation of water. The walls should be tiled, etc. The factory building should be airtight, and aluminum alloy doors and windows should be mostly used. The washing, filling and capping parts can be specially made into closed workshops.

6. Water plant equipment: It must be "RO" secondary reverse osmosis pure water production equipment that has obtained a "license" approved by the Ministry of Health.

1. Water plant equipment can be selected with a larger pure water output (at least 1 ton/hour or more. About 1,200 barrels/day).

2. The water supply station equipment can be smaller (0.25 tons/hour, about 300 barrels/day).

7. Funds: At least 100,000-150,000 yuan (excluding factory buildings) is required to set up a water plant.

1. Go to the Industrial and Commercial Bureau to apply for a business license.

2. Go to the tax bureau to apply for a tax registration certificate.

3. Go to the Health Bureau to apply for a health license.

4. Go to the Technical Supervision Bureau to apply for a production license, which is QS certification.

8. Laboratory is indispensable

Quality inspection is an important part of the credibility of the company's product quality, if quality is the life of the company. Quality inspection is to check the microbial indicators. The specific indicators are the total number of bacteria, E. coli, etc.

Hope it will be adopted.