The construction project of Boxing Ginza Mall was developed and constructed by Zibo Furuite Real Estate Co., Ltd., which is a key urban construction project in Boxing County in 2008. The project consists of Ginza Shopping Plaza and Ginza Fashion Pedestrian Street, located in the north of Bocheng Fifth Road and east of Shengli Second Road, with a total area of 25,080 square meters, a planned land area of 22,000 square meters and a total construction area of 43,256.86 square meters, of which Ginza Shopping Plaza has a construction area of 25,583 square meters and an investment of 51kloc-0/60,000 yuan. Ginza Fashion Pedestrian Street has a building area of 17673.86 square meters and an investment of 28.27 million yuan. The total investment of the whole project is 90 million yuan, and the construction period is 2 years. After the project is completed and put into production, it will pay 8 million yuan in profits and taxes every year, solve the employment problem of about10.5 million people, and the annual turnover is about 280 million yuan. As a landmark building of urban blocks and commercial streets, Ginza Shopping Mall in Boxing County, its architectural layout, modeling and spatial composition are in line with the overall regional style, reflecting the modern atmosphere of connecting the past with the future, with strong landmark architectural characteristics.

Up to now, the four-story frame, beam, slab, column and steel bar of Ginza Shopping Plaza in Boxing County have been basically completed, the underground parking lot is being backfilled, the sanitation on the first floor has been cleaned up, and the sanitation on the second floor is being cleaned up. Now the construction team is required to work overtime to ensure that the 5438+ 10/0 frame will be capped in June 2009, and at the same time ensure the quality and safety. After the completion of the first-floor enclosure wall, the backfilling of the underground garage was completed, the installation of the first and second floors of the underground parking lot was completed in winter, and the construction of the ceiling keel was completed, reaching the completion conditions on May 1 day, 2009.

The concrete pouring of the first floor of the main body of No.4 shop in Ginza Fashion Pedestrian Street was completed, and the pile foundations of No.2 and No.3 shops and comprehensive buildings were completed, and the foundations of No.3 and No.2 shops and comprehensive buildings were completed in 2009 1 month 10. Shops in Fashion Pedestrian Street 1#, 2#, 3# and 4# reached the completion conditions on July 30th. The comprehensive building reached the completion condition on August 30th.