Introduction to Xiamen Gaoqi International Airport?

Xiamen Gaoqi International Airport (IATA code: The managed international airport is located on Dailiao Road, Huli District, Xiamen City, Fujian Province, China. As the most important international aviation hub between the Yangtze River Delta and the Pearl River Delta, Gaoqi Airport is an important international trunk airport and regional aviation hub port on the southeast coast. It is also the base airport of Xiamen Airlines Co., Ltd.

Starting from December 28, 2014, Gaoqi Airport T4 Terminal opened and operated with the original T3 Terminal on both floors. The annual passenger throughput of Xiamen Gaoqi International Airport increased from the original 15 million to 27 million visitors.

As of 2015, the flight area of ??Xiamen Airport is Level 4E and can take off and land large aircraft such as B747-8. It has a 3,400-meter-long runway, 2 parallel taxiways and 10 contact roads. The apron has a total area of ??770,000 square meters and 71 parking spaces.

The Japanese who occupied Xiamen built the military Gaoqi Airport in 1941. After the victory of the Anti-Japanese War, it was taken over by the National Government in 1947 and converted into a civilian airport. After the Communist Party of China occupied Xiamen in 1949, it closed the airport. In 1950, for military purposes against Taiwan, Zhang Weizi, the then mayor of Xiamen, directed the airport construction headquarters to repair and expand Gaoqi Airport, which was completed at the end of 1952. It was later rebuilt in 1955, but because it was within the shelling range of Kinmen, it was never fully open for use and was abandoned. In October 1981, the State Council approved Xiamen City's report on expanding Gaoqi Airport into an international airport. At the same time, with the help of Jiang Zemin, then director of the State Planning Commission, Xiamen Airport obtained a US$21 million loan from Kuwait as construction funds. On January 10, 1982, Gaoqi Airport broke ground. The sea trial was completed in July 1983. It was officially opened to navigation on October 22, 1983. It is the first airport in China to be constructed entirely with foreign loans and the first international airport to be decentralized and managed by local governments.

The second phase of expansion was carried out from 1993 to 1996. The new terminal building was designed by East China Design Institute and Canadian B H Architects.

The third phase of the airport expansion project in 2006 will be based on the current second phase and start from four aspects: flight area, air traffic control system, passenger terminal area and cargo area. The expansion project is expected to last until 2015.

Starting from December 28, 2014, the new T4 terminal of Xiamen Gaoqi International Airport was officially opened. The new terminal has a total construction area of ??approximately 108,000 square meters, including the main building and the corridor. It has an "L" shaped layout and a designed annual throughput capacity of 12 million passengers. After the opening of the new T4 terminal, which will operate on both floors of the original T3 terminal, the annual passenger throughput of Xiamen Gaoqi International Airport will increase from the original 15 million to 27 million.

Xiamen Gaoqi International Airport Apron