Job Recruitment Website - Social security inquiry - How to write the site safety contract?

How to write the site safety contract?

How to write a construction site safety contract for Party A;

Party B:

In order to implement the policy of "safety first, prevention first", clarify the safety responsibilities of both parties, and ensure the safety of people, power grid and equipment during construction, this agreement is signed by both parties through consultation in accordance with relevant national laws and regulations.

The first project: the clinker cement production line project of Toksun Sanchuan Building Materials Co., Ltd.

Article 2 Construction Address: Toksun County Energy and Heavy Chemical Industry Park

Article 3 Party A's Safety Responsibility

1. Before starting construction, Party A shall make technical disclosure on construction safety to Party B, and have written records or materials.

2. Party A shall require Party B to formulate construction safety measures before commencement and report them to Party A for the record.

3. Party A has the obligation to assist Party B in safety production, fire control management, supervision and inspection. Party A has the right to inspect and urge Party B to implement the relevant work regulations on safe production, stop and correct Party B's behavior that does not conform to safe and civilized construction, and issue a safety rectification notice until exiting.

4. Party A shall designate comrades to be responsible for contacting Party B in production safety.

Article 4 Party B's Safety Responsibility

As the contractor of the project, Party B shall be responsible for the safety of personal injury and equipment damage accidents during the construction. Party B shall earnestly perform the following safety responsibilities:

1. Relevant qualification certification materials required for contracting projects provided by Party B shall be true, legal and effective.

2. On-site construction shall comply with national and local laws, regulations and rules on labor safety and employment, and ensure the legality of employment. Party B must provide personal insurance for the construction personnel in accordance with relevant national regulations, and equip them with qualified labor protection articles and safety appliances.

3. During the construction period, Party B shall have full-time safety supervisors.

4. In all construction activities, Party B must prepare safety construction measures, make a comprehensive safety technical disclosure to all construction personnel before construction, and implement them correctly and completely during the whole construction process. It is forbidden to arrange construction without measures or disclosure.

5. The quantity and quality of construction machinery, instruments and safety protection appliances used by Party B in this project must meet the construction needs and meet the safety requirements after inspection by qualified inspection units. Personal injury and equipment damage caused by improper use of instruments and tools shall be borne by Party B..

6. Before starting work, Party B shall organize all construction personnel to carry out safety education, and special operators must hold qualified and effective qualification certificates issued by relevant departments.

7. Before starting work, Party B shall organize personnel to inspect the construction area, working environment and the use of facilities, equipment and tools provided by Party A to confirm that they meet the safety requirements. Once the work starts, it means that Party B has confirmed that the construction site, working environment, facilities, devices and tools meet the safety requirements and are in a safe state.

8. Party B shall set up temporary fences or warning signs within the construction scope, and shall not carry out construction beyond the designated construction scope, and prohibit irrelevant personnel from entering the construction site. Without the consent of Party A, Party B shall not use Party A's facilities and equipment unrelated to construction without authorization; Party A's protective facilities and signs shall not be removed or changed without authorization.

9. If Party B needs electricity and water during the construction, it should contact Party A in advance, and it is not allowed to connect without permission. If there is a fault, immediately interrupt the operation or cut off the relevant switch.

10. Party B must accept the supervision and inspection of Party A and promptly rectify the safety rectification opinions put forward by Party A. ..

1 1. In case of casualties, power grid and equipment accidents or unsafe conditions endangering production execution during construction, Party B shall immediately report to Party A and actively cooperate with the investigation.

Article 5 Contact information and reply time of Party A and Party B: Party A and Party B shall communicate with each other in written form such as work contact sheet, fax and telex. After receiving the written contact from the other party, both parties shall respond within 4 hours.

Article 6 Construction security deposit

Party A reserves 50,000 yuan as the deposit of Party B. Party B has no serious personal injury, power grid and equipment accidents or above during the construction, and the deposit will be fully refunded after the project is completed and accepted; During the construction, if any of the following safety accidents that Party B is responsible for occur, the corresponding security deposit will be deducted:

(1) In case of fatal accident, major accident of power grid and device, all safety deposit shall be deducted;

(2) In case of personal injury accident, power grid and equipment accident, 50% safety deposit shall be deducted;

(3) The economic penalty for the illegal behavior of Party B's personnel shall be deducted from the deposit according to the penalty provisions.

Article 7 Liability for breach of contract

1. If the other party or the third party suffers personal injury, equipment damage and other property losses due to the responsibility of Party A or Party B, the responsible party shall bear the corresponding responsibilities and compensate the other party or the third party for all losses caused thereby.

2. If Party B uses facilities, equipment and tools, etc. If the damage is caused by Party A, it shall be compensated according to the price.

3. If Party B's personnel go to other production areas without reason or use Party A's facilities and equipment without authorization, Party B shall be liable for breach of contract according to 100 -500 yuan/person.

4. If Party B fails to rectify the safety rectification opinions put forward by Party A in time, Party B shall bear the liability for breach of contract of 200- 1000 yuan/day for each day overdue.

Article 8 Any dispute arising from the execution of this Agreement shall be settled by both parties through consultation and mediation. If negotiation or mediation fails, either party may bring a lawsuit to the local people's court.

Article 9 Party A and Party B must strictly perform this agreement, and the legal effect of this agreement is independent of the main contract.

Article 10 The validity period of this agreement: from April 28th, XX to the date of project completion.

Article 11 This Agreement is made in quadruplicate, with Party A and Party B holding two copies respectively.

Article 12 Signing place of this Agreement: Toksun County, Xinjiang.

Party A: Party B:

Signature: signature:

Tel: Tel:

Signing time: year month day

How to write the construction safety contract? There is no safety contract in construction, only safety construction agreement. As an annex to the contract, there are standard words.

Safety measures on the construction site Safety management measures on the construction site: Safety management is a management activity to realize the safety production of construction projects. The focus of safety management on the construction site is to control the unsafe behavior of people and the unsafe state of things, and to implement safety management decisions and objectives. The purpose of management is to eliminate all accidents, avoid accident injuries and reduce accident losses. Control is the restriction and restriction of a specific factor and an important part of management scope. Safety management measures are the methods and means of safety management, and the focus of management is to restrict and control the state of various factors in production. According to the characteristics of construction production, safety management measures have distinct industry characteristics.

Implement safety responsibility and responsibility management. The construction project management department is responsible for the control and management of construction production schedule, cost, quality and safety. Therefore, we must bear the responsibility of safety management and safety production at the same time.

1. Establish and improve the leading organization for safety production headed by the project manager, and carry out safety management activities in an organized and leading manner. Responsible for organizing and leading safety production.

2, the establishment of personnel at all levels of production safety responsibility system, clear the safety responsibility of personnel at all levels. Pay attention to the implementation of systems and responsibilities, regularly check the implementation of safety responsibilities and report in time.

(1) The project manager is the first person responsible for the safety management of construction projects.

(2) Functional departments and personnel at all levels are responsible for the requirements of safety production within their respective business scope.

(3) All staff shall take the responsibility for production safety, and establish the responsibility system for production safety, so that the production system can run vertically from the manager to the workers without missing a link. The responsibility for production safety of all functional departments and personnel should be horizontal to the edge, and everyone is responsible.

3. The construction project shall pass the safety production qualification examination of the regulatory authorities and be recognized.

All personnel engaged in production management and operation, according to the production content they are engaged in, respectively passed the safety review of enterprises and construction projects, obtained the safety operation approval certificate, and took up their posts with certificates.

Special operations personnel, in addition to the safety review of enterprises, also need to participate in the safety operation assessment according to regulations; Obtain the safety operation certificate issued by the Ministry of Supervision, and adhere to the "certificate". In case of unlicensed operation of special operations on the construction site, the construction project must bear the management responsibility.

4, the construction project intends to be responsible for the state inspection and acceptance of construction production, undertake the management responsibility of material state inspection and out of control, and accept the resulting economic losses.

5, all management, operation personnel are required to sign a safety agreement with the construction project intends to make safety guarantee to the construction project intends to.

6, the inspection of the implementation of the responsibility for production safety, should be carefully recorded in detail, as one of the original data of distribution and compensation.

How to write the safety management inspection record of the construction site, as the name implies, is what safety hazards you found in the inspection of the construction site, and record the problems, such as: 1. So-and-so climbing operation is not tied with safety rope;

2. A pothole is not marked with safety warning signs;

3. The excavator construction site is too close to the workers' working area;

4. Excessive accumulation of building materials, etc.

On-site management security can consider digital management mode. Using the networking function of equipment, Kuang changed the traditional management mode of "one person is responsible for one machine" and realized the efficient digital management mode of "one person is responsible for multiple machines", "one person is responsible for one workshop" and even "unmanned workshop". Significantly reduce the labor and employment in the production line, especially the dirty work, tired work, polluting work and dangerous work.

What is written in the safety diary of the construction site? Date, temperature, wind, weather, etc.

Then there is the construction site, what are the special types of work, where hot work is needed, and where there is external scaffolding work.

Where there are hidden dangers, rectification within a time limit. On-site water; Inspection of temporary power supply. That's all.

How to write the labor contract for ordinary workers on the construction site If you hire temporary workers, you can sign an employment contract with them. If the employee is a long-term worker (the two parties form a long-term and stable labor relationship), a labor contract should be signed with him.

Templates for employment contracts and labor contracts are available in Baidu Library.

How to write industrial injury in construction site? First go to the Social Security Bureau to identify the work-related injury, then identify the disability level (provide valid evidence), and claim compensation from the construction unit according to the disability level. (I just need to write clearly about the injury process on the construction site)

"Five Signs" of Construction Site Safety? Answer: "Five signs", namely: indicating signs, warning signs, prohibition signs, power safety signs and prompting signs.