Job Recruitment Website - Zhaopincom - Building Foreman Job Responsibilities

Building Foreman Job Responsibilities

Job Responsibilities of Building Foreman (4 general articles)

Nowadays, the frequency of using job responsibilities is gradually increasing, and the job responsibilities mainly emphasize what should be done within the scope of work. responsibility. So, have you mastered the format of job responsibilities? The following are the job responsibilities of the building foreman (4 general articles) that I have compiled for you. I hope it will be helpful to you.

Job Responsibilities of Building Foreman 1

1. Each professional foreman is directly responsible for the organization and coordination of machinery, site capacity, and labor force for each professional project;

2. Responsible for the effective implementation and management of the construction schedule;

3. Responsible for preparing the application plan for the materials required for the project. The number of materials applied for should not be roughly estimated, and strive to be accurate to reduce unnecessary impact on the project. expenses and losses;

4. Responsible for formulating measures for material quotas, rational use of materials, and material conservation measures;

5. Conduct technical, quality, planning, and civilized construction of the team , occupational health, production safety, and environmental protection, and track and inspect the implementation; supervise the team to carry out "three inspection activities" to keep records of activities, solve problems in a timely manner, and keep construction logs;

6 , Responsible for the implementation, implementation and execution of on-site finished product quality protection work;

7. Assist the estimator in the preparation of the professional construction budget (settlement);

8. Organize safety production work, strengthen safety management, and have the right to stop illegal operations and refuse orders for illegal operations. Strengthen site management, urge the team to complete the site clean, and not waste materials. The operating platforms, operating frames, and tools used by the construction operators must be regularly inspected for safety and hidden dangers;

9. Responsible for the inspection of all work performed by the engineering team Complete the review and approval of project quantities;

10. Strengthen the layout and reasonable stacking of materials in this major. Prevent damage and waste caused by unreasonable stacking and affect the appearance of the site;

11. Responsible for on-site technical review work, and complete the inspection work of each sub-project, and check the handover of materials when the project is completed Responsible for accuracy, completeness and traceability;

12. Work content must be changed and production tasks arranged based on valid construction drawings and designs;

13. Responsible for the measurement work of this profession and management of measuring instruments;

14. Participate in the assessment of the project integrated management system, promptly correct existing problems, identify, evaluate, and update project construction environmental factors, risk factors and major risk factors, and Implement, inspect and record its operation process;

15. Complete other tasks assigned by the leader. Job Responsibilities of Building Foreman 2

1. Lead subordinate managers to strictly implement the production operation organization instructions, process flow, process standards and safety, technology and quality requirements issued by the project management.

2. Responsible for timely feedback of information during the execution process.

3. Responsible for calculating the quantities of each sub-project within the area of ??responsibility and checking them accurately with the team and then with the costing personnel.

4. Be fully responsible for the quality, safety and progress of the section.

5. Responsible for the preparation of the weekly progress plan for the responsible area.

6. Obey the project management’s instructions on site.

7. Assist project management in training special work operators and ensure that special work operators hold certificates to work.

8. Participate in the handling of safety and quality issues during the construction process.

9. Participate in semi-monthly safety production inspections.

10. Participate in the monthly comprehensive evaluation of project functional departments.

11. Participate in the review of subcontractors.

12. Participate in the review and disposal of non-conforming products, and participate in the implementation of corrective and preventive measures.

13. Complete other tasks assigned by the leader in a timely manner.

Job Responsibilities of Building Foreman 3

1. Under the leadership of the project manager, be responsible for the site appearance, progress, safety, quality, materials, costs, and public security within the jurisdiction.

2. Conscientiously implement the company's management system policy, corporate purpose, corporate spirit and professional ethics, and organize construction and management in strict accordance with procedural documents.

3. Be familiar with construction drawings, participate in drawing review, assist the project department in implementing the whole process management of the project, and ensure the realization of the project contract objectives.

4. Develop specific project planning and construction organization design, and prepare for construction; propose the exact entry and exit dates and quantities of labor, materials, and mechanical equipment, and do a good job in process overlapping.

5. Responsible for presiding over positioning, setting out, leveling and technical explanations of key parts, implementing construction specifications, operating procedures, quality assessment standards, guiding on-site construction, and correctly handling various technologies that occur during the construction process or quality and safety issues.

6. Provide written and oral technical explanations and safety measures before construction, and provide three-level safety education to employees and migrant workers.

7. Timely arrange the submission of raw materials and concrete and mortar test blocks for inspection and testing, timely fill in the construction diary and concrete construction records, keep records of hidden projects during the construction process, and organize the quality of sub-projects Evaluate, fill in the evaluation form, collect and organize various archives in a timely manner, draw as-built drawings, and ensure complete handover and acceptance information.

8. Timely prepare original statistical data on the consumption of materials, labor, machinery, etc. that constitute the cost project, to provide a basis for cost control and analysis of engineering projects.

9. Pay attention to on-site labor discipline, and do a good job in site management, public security and civilized construction.

10. Earnestly complete the monthly production task orders and complete the settlement of the project in a timely manner. Responsibilities of the Building Foreman Job Responsibilities 4

1. Under the leadership of the manager of the Building Management Department, the technical person in charge shall be responsible for the dimensions, elevations, steel bars, formwork, concrete, masonry, decoration and other processes of the entire construction process. Inspect, accept, and evaluate quality, propose rectification suggestions, and supervise implementation.

2. Participate in the joint review of drawings, participate in the preparation of project quality plans and construction plans, and be responsible for their implementation.

3. Responsible for the implementation of various professional and technical standards, strict implementation of construction acceptance specifications, procedures and quality standards, and disclosure of specifications and drawings to quality personnel.

4. Conduct technical briefings on divisions and sub-projects to each team, be responsible for organizing the team to carry out process handover and concealed acceptance of sub-projects, and be responsible for implementing product identification and traceability.

5. Combined with the requirements of the quality management system, carry out handling, storage and protection work, and cooperate with the building manager to do process control work.

6. The control of special processes, such as underground waterproofing, anti-seepage and large volume, must be monitored throughout the entire process in accordance with the standards.

7. Work with full-time quality inspectors to supervise and inspect the quality of raw materials and semi-finished products.

8. Solve the questions raised by workers at the construction site on the drawings and specific operations.

9. Supervise and guide the work of quality officers and safety officers, coordinate the relationship with various functional departments and supervisors, and be able to communicate from top to bottom.

10. Cooperate with the building manager to do subcontracting management work, check the implementation of the drawings and specifications of the subcontracting unit, and conduct monthly evaluations. ;