Location of resettlement site of Jinchuan Hydropower Station

This question is too general. I know Heishui County.

The larger Heishui Maoergai Power Station, on the road from Maoxian to Heishui, has an installed capacity of 428,000 and is under construction.

There is a sunshine power station in Heishui Sunshine Township with an installed capacity of 1.8 million, which is in operation.

There is a Jianke power station on Songpan boundary of Sunshine Power Station, which is under construction.

There are many towns and villages in Shashi, and the installed capacity of Sibangou Power Station is 24,000.

Erdaoqiao Power Station in Dagu Glacier Scenic Area of Lu Hua Town is in operation.

Hongyan Township, Zhugeduo Power Station, installed capacity of 80,000, Changde Zumu Power Station, in operation.

Selgu Township, Selgu Power Station, with installed capacity of 1.5 million.

Zhawo Township Hot Water Pool Power Station has been put into operation, Zhawo Power Station and Deng Peng Power Station are under construction, as well as Xili Power Station.

Deshiwo Power Station in Deshiwo Township, with installed capacity of 1.8 million under construction.

Simei Village and Simei Power Station are under construction.

Shidiaolou Township, Shidiaolou Power Station is under construction.

Musu Township, Musu Power Station is under construction.

Anemarrhena asphodeloides, Unity Power Station

There are other small power stations with thousands of installed capacity, such as Hongyan Power Station, Rentougou Power Station, Gulu Power Station, Deshiwo Power Station, Ergulu Power Station and Mawo Power Station.

There is also the Ergulu power station to be built.