What is the maximum tonnage of Xiaoqing River after resumption of navigation?

The maximum tonnage of Xiaoqing River after resumption of navigation is 1800 tons.

Xiaoqing River is169.2km long, and there are many bridges, rivers, various water conservancy facilities, river-crossing pipelines and power lines along it that need to be rebuilt.

Among them, China Railway 14th Bureau is mainly responsible for the construction of the second bid section of Xiaoqing River resumption project, with a total length of 26.7km, 4 locks 1 seat, 4 bridges, 2 irrigation stations1seat, 3 inverted siphons, 50 culverts, 33 river-crossing pipelines and 36 power cables.

Since the construction of the Second Bid Section undertaken by China Railway 14th Bureau, 4.5 million cubic meters of dry dredging has been completed, with dredging 1.28 million cubic meters, accounting for 72% of the overall construction task. After the resumption of navigation, the maximum tonnage of Xiaoqing River is 1.800 tons.

Brief introduction of Xiaoqing River shipping

Xiaoqing River is the only river in Shandong Province with multiple functions, such as land-water combined transport, river-sea combined transport and farmland irrigation, with a total length of 237 kilometers, a navigable section of 170 kilometers and a drainage area of 10336 square kilometers.

Xiaoqing River has a history of more than 900 years since it was dug, and it was once a prosperous shipping waterway in history. 1997 after the business was suspended due to water shortage and other reasons, it is about to usher in a new life after many renovations.