Discussion on how to effectively manage the construction site through electrical supervision
1 scope of supervision
Installation, debugging, test and acceptance of electrical engineering, and installation, debugging and acceptance of weak current engineering.
2 supervision content
2. 1 acceptance of equipment and materials;
2.2 Process handover confirmation;
2.3 transformer installation;
2.4 Installation of complete power distribution cabinets, control cabinets (screens, tables) and power lighting distribution boxes (panels);
2.5 Check the wiring of the low-voltage motor;
2.6 Uninterruptible power supply installation;
2.7 Testing and debugging of low-voltage power equipment;
2.8 bus installation;
2.9 Cable tray installation and cable laying in the tray; Laying of wire conduit, cable conduit and trunking; Wire and cable threading and trunking;
2. 10 cable head manufacturing, wiring and line insulation test;
2. 1 1 Installation of lamps, switches and sockets;
2. 12 architectural lighting debugging;
2. 13 installation of grounding device; Equipotential bonding of buildings;
2. 14 elevator installation;
2. 15 electric fire alarm linkage system;
2. 16 weak current integrated wiring;
2. 17 weak current system installation;
2. 18 division project acceptance; Completion acceptance.
3 Monitoring objectives
3. 1 construction quality control objective: the qualified rate of sub-projects reaches 90%; The qualified rate of some projects reached100%; The qualified rate of unit project reaches 100%.
3.2 Construction investment control objective: control the overall investment according to the requirements of the construction contract.
3.3 Construction progress control target: the time to complete the electrical engineering construction and reach the completion acceptance conditions according to the general progress plan and the electrical professional progress plan determined by the project.
3.4 Construction contract management objectives: strict management, strive for no project suspension events, and cooperate with the director to deal with project suspension events; Strictly manage engineering changes; Handle the cost claim, construction delay, contract dispute and termination of the project.
4 supervision methods
4. 1 working procedure: according to the characteristics and working contents of the elevator project, formulate the supervision procedure of the elevator project.
4.2 Supervision methods in the preparation stage.
4.2. 1 Be familiar with the design documents and put forward opinions and suggestions on the problems existing in the drawings;
4.2.2 Participate in the design disclosure meeting, review the construction organization design submitted by the contractor, and put forward the review opinions;
4.2.3 Review the subcontractor's business license, enterprise qualification certificate and special industry construction permit, and report to the chief supervision engineer for signature;
4.2.4 Review the project commencement application form and related materials submitted by the construction unit;
4.2.5 Attend the first site meeting hosted by the construction unit.
4.3 supervision methods in the construction stage.
4.3. 1 Formulate and implement the system of on-site regular meetings, and do a good job in handover inspection with civil works.
4.3.2 Working methods of engineering quality control.
1) requires the construction unit to submit the construction technology and quality assurance measures for key parts and key working procedures, and sign after approval;
2) Organize a special demonstration of the construction process measures and certification materials submitted by the construction unit for adopting new materials, new processes, new technologies and new equipment, and sign them after approval;
3) Review the application forms of engineering materials, purchased parts, equipment entering the site and their quality certification materials submitted by the construction unit;
4) Carry out parallel inspection or witness sampling for the physical objects entering the site according to the proportion specified in the supervision contract or relevant engineering quality management documents;
5) Refuse to sign the engineering materials, purchased parts and equipment that have not been accepted or qualified by the supervisor, and issue a notice to the supervision engineer to inform the construction unit to evacuate the unqualified engineering materials, purchased parts and equipment from the site within a time limit;
6) Regularly check the technical status of the metering equipment of the construction unit;
7) Patrol and inspect the construction process, supervise the hidden process of concealed works and the key parts that are difficult to check after the next working procedure is completed, and make measurement records;
8) Conduct on-site inspection on the concealed engineering application form and self-inspection results submitted by the construction unit, and sign those that meet the requirements;
9) Review the quality inspection and evaluation data of subdivisional work, and sign after meeting the requirements;
10) inform the supervision engineer of the quality defects in the construction process, rectify within a time limit and check the rectification results;
1 1) When major quality hidden dangers are found, which may cause quality accidents or have caused quality accidents, the chief supervision engineer shall issue a work stoppage order in time, requiring the construction unit to stop work for rectification. After the rectification is completed and the supervision engineer rechecks it, the director shall sign the report of returning to work in time.
12) For the quality accidents that need to be reworked or reinforced, follow up, check and accept the treatment process and results according to the determined treatment scheme.
4.3.3 Engineering safety supervision method.
1) Before the project starts, the project supervision department should hold a symposium on the safety construction of the supervised project to strengthen the in-depth study of safety knowledge and further strengthen the safety awareness of the supervisors.
2) The project supervision department shall formulate safety management responsibilities, implement the safety responsibility system, and implement the director responsibility system, with each professional supervision engineer taking his own responsibilities;
3) Review the safety management regulations in the construction organization design and the safety construction preparation in the starting conditions, otherwise, the construction shall not be started;
4) For the potential safety hazards existing in the construction process, it shall be ordered to stop work for rectification;
5) The supervision engineer shall conduct regular or irregular inspection or on-site supervision on the site, check the safety measures of the construction site and the office and living quarters, issue supervision rectification notice in time for the problems found, collect on-site safety information in time, and handle them in time;
6) Solve problems in safety construction through regular meetings and special meetings;
7) Report the engineering safety information to the owner through various channels in time;
8) Establish a safety construction status registration system, that is, accurately and timely record the safety status in supervision documents such as supervision diary, monthly supervision report and supervision work summary;
9) Establish a reward and punishment system for safety construction management, reward supervisors with excellent performance, and punish supervisors with weak sense of responsibility until they are transferred from supervision posts;
10) Check the safety production management responsibilities of the construction unit; Check the safety management organization chart of the project department of the construction unit; Check the safety assurance system elements and function allocation table of the construction unit; Check the post responsibility system for safety production of project personnel of the construction unit; The construction unit guarantee system elements and function allocation table;
1 1) Review whether there are specific measures to ensure the quality and safety of the project in the construction scheme or construction organization design, so as to meet the requirements of safe construction and supervise its implementation; Check the types and preparation procedures of construction organization design and special construction scheme, and whether the safety measures are reasonable and scientific;
12) Review the safety facilities of the construction unit to ensure that the materials, equipment and safety protection articles required for safety are in place;
13) Strengthen the safety management of subcontractors and check the safety management of subcontractors by the general contractor;
14) check and urge the construction unit to implement the safety protection measures of the division, subdivisional work or each working procedure and key parts according to the requirements of construction safety technical standards and specifications;
15) check the accident hidden trouble management of the construction unit; Check the accident hidden trouble treatment records: accident hidden trouble treatment table, violation treatment registration form and accident monthly report;
16) Check the safety education and training of the construction unit; Check the safety education and training catalogue and record description; All kinds of construction personnel who are new to the construction site must carry out safety education and make records;
17) Check the summary table of labor protection education cards for employees of the construction unit, and remind the construction unit to strengthen the safety education for all construction personnel before and after the festival, and make records;
18) Spot check the safety activities and weekly evaluation records of the construction unit. Check the roster of safety personnel, special operations personnel and certificates of certified personnel of the construction unit;
19) urge the construction unit to educate workers about safety in production, and make safety technical disclosure for partial projects;
20) Supervise and inspect the fire control, cold prevention, heatstroke prevention, civilized construction, health and epidemic prevention work on the construction site.
- Previous article:Five selected speeches on grateful enterprises
- Next article:Naban Reservoir Replenishment
- Related articles
- Basic information of American schools in Shanghai
- Is Xiangneng Zhuoxin treated badly?
- Job responsibilities of the city manager
- Fruit restaurant recruitment
- Who's Sun Dingpu?
- At the beginning of the work summary in the first half of the year
- What does it mean to dream of being bitten by a rabbit?
- What can I do to make braised prawns more tender?
- Are there any Korean enterprises in Zhuhai?
- Is Huifa Food a garbage company?