Job Recruitment Website - Job seeking and recruitment - How to write the feasibility study report of building a teaching building in a school?
How to write the feasibility study report of building a teaching building in a school?
For reference, please adopt it if it is useful!
1.2. 1 steps of long-term feasibility study
1.2.2 Basic contents of feasibility study of public * * * construction projects
(1) project name
(2) background of project construction
(3) Project undertaker
(4) Land for project construction
(5) Project construction period
(6) Content and scale of project construction
(7) Project development and construction mode
(8) Basis for compiling the feasibility study report of public buildings
1.2.3 Expected conclusion of feasibility study of public * * * construction project
(1) the conclusion of the policy feasibility study of the prospective project.
(2) The conclusion of the feasibility study of the prospective product scheme.
(three) the feasibility study conclusion of the proposed site
(4) Forward-looking conclusion of feasibility study of process technology.
(5) the feasibility study conclusion of the prospective equipment scheme.
(6) the feasibility study conclusion of the prospective project scheme.
(seven) the conclusion of the feasibility study of the expected economic benefits.
(8) The conclusion of feasibility study on expected social benefits.
(9) the expected environmental impact feasibility study conclusion
Chapter 2: Market analysis and forward-looking prediction of public construction industry.
2. Scope of products or services involved in1public * * * construction projects.
2.2 Forward-looking market analysis of public * * construction industry
2.2. 1 analysis of policy, economy, technology and social environment
2.2.2 Public * * Construction Market Scale Analysis
2.2.3 Analysis of the profitability of public buildings
2.2.4 Public building market competition analysis
2.2.5 Analysis of Barriers to Public Building Entry
2.3 public * * * construction industry market forecast
Chapter III: Analysis of the construction site of public construction projects.
3. 1 Public * * * Construction Project Location Status
3. 1. 1 geographical location of the project.
3. 1.2 Land right category of the project construction site
3. 1.3 Land use status of the project construction site
3.2 public * * * construction project site construction conditions
3.2. 1 Topography, landform and earthquake situation of the project construction site
3.2.2 Engineering Geology and Hydrogeology of the Project Construction Site
3.2.3 Economic conditions of the project construction site
3.2.4 Traffic conditions of the project construction site
3.2.5 Public facilities at the project construction site
3.2.6 Flood control, moisture-proof and drainage facilities at the project construction site
3.2.7 Legal support conditions of the project construction site
3.2.8 Climatic conditions of the project construction site
3.2.9 Natural resource conditions of the project construction site
3.2. Population status of the10 project.
3.3 Comparison of construction conditions of public * * * construction projects
3.3. 1 Comparison of project construction conditions
3.3.2 Comparison of Project Construction Investment
3.3.3 Comparison of project operating expenses
3.3.4 Project recommended site selection scheme
3.3.5 Location map of the project site
Chapter IV: Technical scheme, equipment scheme and engineering scheme of public construction projects.
4. 1 technical scheme of public * * * construction project
4. 1. 1 project production method
4. 1.2 project process
4. 1.3 technical sources of the project
4. 1.4 process flow chart of recommended scheme
4.2 Public * * Construction Project Equipment Scheme
4.2. 1 Selection of main equipment for the project
4.2.2 Main equipment sources of the project
4.2.3 Main equipment of recommended scheme
4.3 Public * * * Construction Project Plan
4.3. 1 Project construction content
4.3.2 Special foundation engineering scheme of this project
4.3.3 Project Construction Scale
4.3.4 Project Construction and Installation Quantity Estimation
4.3.5 List of major construction projects of the project
Chapter 5: Analysis of energy-saving schemes of public building projects.
5. 1 Analysis of energy-saving policies and regulations
5. 1. 1 Energy-saving Policy Analysis
5. 1.2 Analysis of Energy Saving Code
5.2 Energy consumption analysis of public building projects
5.2. 1 * * Energy supply status of construction projects.
5.2.2 Energy consumption analysis of public building projects
5.3 Analysis of energy-saving objectives and measures of public * * * building projects
5.3. 1 project energy saving target
5.3.2 Measures to save heat energy
Power saving measures
5.3.4 Water saving measures
5.4 Energy-saving effect analysis of public * * * construction projects
5.4. 1 Energy saving effect of equipment
5.4.2 Building energy-saving effect
Chapter VI: Environmental protection analysis of public construction projects.
6. 1 Environmental conditions of public building construction site
6.2 Main pollution sources and pollutants of public * * * construction projects
6.2. 1 Analysis of main pollution sources of the project
6.2.2 Analysis of main pollutants in the project
6.3 Environmental protection measures for public * * * construction projects
6.3. 1 air pollution prevention and control measures
6.3.2 Noise pollution prevention and control measures
6.3.3 Water pollution prevention and control measures
6.3.4 Prevention and control measures of solid waste pollution
6.3.5 Greening measures
6.4 Environmental Protection Investment Budget
6.5 Environmental Impact Assessment and Analysis
6.6 Geological disasters and special environmental impacts
6.6. 1 * * Geological disasters at the construction site of building engineering.
6.6.2 Risk of geological disasters caused by public construction projects.
6.6.3 Geological disaster prevention measures
6.6.4 Special environmental impact and protection measures
Chapter VII Labor Safety and Fire Control of Public Building Projects
7. 1 Compilation basis and implementation standard
7. 1. 1 project compilation basis
7. 1.2 project execution standard
7.2 Risk factors and hazard degree
7.2. 1 Main parts with potential safety hazards and their hazard degree
7.2.2 Types and harm degree of harmful substances
7.3 Forward-looking security measures scheme
7.3. 1 process and equipment safety selection measures
7.3.2 Protective measures for dangerous operations
7.3.3 Protective measures for dangerous places
7.4 Prospective fire prevention measures
Fire hazard analysis
7.4.2 Forward-looking fire control facilities scheme
Chapter VIII: Organizational structure and human resource allocation of public construction projects.
8. Organizational structure of1public * * * construction project
8. 1. 1 project legal person establishment plan
8. 1.2 Organizational structure of project management organization
8.2 allocation of human resources for public construction projects
8.2. 1 Project personnel
8.2.2 Staff Source and Recruitment Scheme
Staff training plan
Wages and benefits
Chapter 9: Analysis of the implementation progress of public construction projects.
9. 1 construction project implementation schedule
Establishment of project management organization
9. 1.2 project financing arrangement
9. 1.3 Project Technology Acquisition and Transfer
9. 1.4 engineering survey and design
9. 1.5 project equipment order
9. 1.6 project construction preparation
9. 1.7 project completion acceptance
9.2 Public * * Construction Project Implementation Schedule
Chapter 10: investment budget and financing scheme of public construction projects
10. 1 construction project investment budget
10. 1. 1 total project investment
10. 1.2 Investment in fixed assets
10. 1.3 liquidity
10.2 financing scheme for public construction projects
10.2. 1 project fund raising
10.2.2 project debt financing
10.2.3 project financing scheme analysis
Chapter 1 1: financial evaluation and analysis of public construction projects.
1 1. 1 Basis and scope of financial evaluation
11.1.1financial evaluation basis
1 1. 1.2 scope and methods of financial evaluation
1 1.2 Forward-looking estimation of sales revenue of public * * * construction projects
1 1.2. 1 production scale of products
1 1.2.2 Project implementation progress
1 1.2.3 New sales revenue, value-added tax and additional estimates
1 1.3 Forward-looking estimation of operating cost and total cost of public * * * construction projects.
1 1.3. 1 Basic data of cost estimation
1 1.3.2 Annual Total Cost Estimation
1 1.3.3 year operating cost estimation
1 1.4 Analysis of financial profitability
1 1.4. 1 total profit and distribution
1 1.4.2 cash flow analysis
1 1.4.3 investment benefit analysis
1 1.5 financial liquidity analysis
1 1.6 financial feasibility analysis
1 1.7 uncertainty analysis
Breakeven analysis of 1 1.7. 1
Sensitivity analysis of 1 1.7.2
1 1.8 main data and indicators of financial evaluation
Chapter 12: Forward-looking evaluation and analysis of social benefits and risks of public construction projects.
12. 1
12.2 * * Risk Outlook of Construction Project
12.2. 1 qualitative risk analysis of the project
12.2.2 project risk prevention measures
Chapter 13: attached drawings, schedules and annexes
- Related articles
- It usually takes more than an hour for an hourly worker in Li Jinde, Jinan.
- The labor contract of Anhui Tongcheng Shengyun Co., Ltd. is signed and workersĄŻ wages are paid on the 15th-20th of each month. Today is the 27th of Chu month. Wages have not been paid. I want to ask..
- Address of xinyuan county Detention Center, Nanyang, Henan
- Dandong children's photography which is good?
- How much is the salary of Mercedes-Benz sales consultant?
- How about COFCO Fulinmen Food Marketing Co., Ltd. Chengdu Branch?
- Responsibilities of administrative personnel
- Tianjin Acrobatic Troupe employee benefits
- A lost horse will become thin, and a lost fortune teller will become poor.
- Taiyuan xiaodian district Yingdi Automobile Navigation Distribution Office Recruitment Information, Taiyuan xiaodian district Yingdi Automobile Navigation Distribution Office?